Zhengzhou Yaku Electromechanical Equipment Co.,LTD

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsGypsum Spraying Machine

Red Gypsum Plastering Machine / High Efficiency Mortar Spray Equipment

Certification
Good quality Cement Spray Machine for sales
Good quality Cement Spray Machine for sales
Yaku is very professional, shipping is quick and safe, the most importan is the good quality! So glad to work with you guys.

—— Jerry

Your productivity, service attitude, and sincerity of cooperation all make us very satisfied. A trusted partner.

—— Luke

I'm Online Chat Now

Red Gypsum Plastering Machine / High Efficiency Mortar Spray Equipment

China Red Gypsum Plastering Machine / High Efficiency Mortar Spray Equipment supplier

Large Image :  Red Gypsum Plastering Machine / High Efficiency Mortar Spray Equipment

Product Details:

Place of Origin: Zhengzhou China
Brand Name: Yaku
Model Number: 1500F

Payment & Shipping Terms:

Minimum Order Quantity: negotiation
Price: Negotiable
Packaging Details: Airworthy Wooden Box
Delivery Time: 5-7 days
Payment Terms: First payment
Supply Ability: 100 units per year
Contact Now
Detailed Product Description
Name: Gypsum Plastering Machine Feature: High Efficiency
Application: Gypsum Power: 1500W
Size: 600*350*600 Voltage: 220V
Weight: 39 Kg Color: Red
Hopper Loading: 45 Kg Working Efficiency: Waterproof Coating 300-500 Flat / Hour

Red Gypsum Plastering Machine / High Efficiency Mortar Spray Equipment

 

Gypsum Plastering Machine Application

 

1, In the construction engineering industry, the machine is used for horizontal and vertical transferring and spraying mortar or cement.

2. In the chemical and paper industry, delivering the raw pulp material and waste materials.

3. In coal-fired power plants , the machine is used to deliver the fine coal mortar.

4. In the mining tunnel construction industry, the machine is used to grout and protect slope.

5. In the highway pavement maintenance, it used for road surface collapse pressure mud filling.

6. In Prestressing structure construction, the machine is used for cement road surface collapse pressure mud filling.

 

Gypsum Plastering Machine Specifications

 

Name: Gypsum Plastering Machine Feature: High Efficiency
Application: Gypsum Power: 1500W
Size: 600*350*600 Voltage: 220V
Weight: 39 Kg Color: Red
Hopper Loading: 45 Kg Working Efficiency: Waterproof Coating 300-500 Flat / Hour

 

Use of equipment:


1. Install the machine according to the overall connection diagram of the machine.
2. Prepare a national standard 4 square copper core cable (three core wire) and install 1 socket (plug and socket should be connected to the ground wire, the machine must be connected to the ground wire) and confirm that the power supply used is 220V.
3. Check if there are any foreign objects and small parts in the hopper and the delivery bin. After confirming that there is no foreign matter, you can carry out the following operations.
4. Take 3-5kg of clean water into the hopper, and start the machine at low speed to discharge the clean water into the material pipe to lubricate the inner wall of the material pipe. After the material pipe is to be lubricated, all the water in the material pipe is discharged.
5. Pour the evenly stirred material into the hopper.
6. After the air compressor is full, turn on the sprayer power main switch, open the spray gun valve, open the spray gun valve, slowly adjust the speed control knob to the required speed and start spraying (the start switch of the machine is connected to the spray gun valve). The air flow switch opens the air gun valve to start the machine and closes the air gun valve to stop the machine.
7. In normal work, the material can be continuously fed without stopping. If there is no material in the hopper, it should be fed or stopped in time. The machine must not work in the state of no material in the hopper.
8. When shutting down, the material valve should be closed first, then the gas valve should be closed quickly. If the gas valve is not closed in time after closing the material valve, there is a danger of bursting the material tube.

 

Equipment cleaning and maintenance:


1. Disconnect the main power switch and unplug the power supply before cleaning the device.
2. Wipe the motor shield frame and the inside and outside of the hopper with a wet rag that wrings out the water.
3. Remove the hopper, open the drain valve under the delivery bin, and thoroughly clean the delivery bin. After cleaning, close the drain valve and reinstall the hopper (Note: the machine must be powered off when cleaning the bin)
4. Add about 15kg of clean water to the hopper. Press the power supply of the machine to remove the nozzle and the cap of the spray gun.
5. Close the air valve of the spray gun, open the material valve of the spray gun and clean the air valve. The spray gun head is aligned with the open space, and the material pipe and the spray gun are cleaned with high pressure gas and clean water. When cleaning, close the material valve for 3-5 seconds, gather the pressure inside the material tube, then quickly open the material valve and then close the material valve for 3-5 seconds. Then open the material valve quickly and repeat until the material tube is cleaned.
6. When cleaning the machine, it is strictly forbidden to extend the head hand and other debris into the hopper. It is strictly forbidden to aim the gun at the human body and the electrical box.
7. When the spray gun no longer has sewage flowing out, close the cleaning air valve, stop the machine, open the drain valve under the delivery bin, remove the remaining clear water in the delivery bin, and close the drain valve after the drain is over.
Remove the material tube and drive out the water in the material tube. The tray is taken up and the nozzle is kept in a safe place.
8. Remove the material from the tube and drive out the water in the material tube. The tray is taken up and the nozzle is properly kept. Turn off the machine's power switch, unplug the power cord, and the machine is clean.

 

Precautions:


1. The power supply used in this machine is 220V, and it is strictly forbidden to connect 380V power supply;
2. The machine must be connected to the ground wire when using it;
3. When cleaning the machine, be sure to turn off the main power switch;
4. It is strictly forbidden to extend the head and other debris into the hopper when the machine is running;
5. It is forbidden to clean the inside of the hopper when the machine is running;
6. It is strictly forbidden to idle the machine in the hopper;
7. Close the gun air valve immediately after closing the gun material valve, the interval time is strictly prohibited for more than 3 seconds;
8. When spraying thicker materials or using small nozzles for spraying, it is strictly prohibited to run the machine at high speed;
9. When cleaning the material pipe of the machine, it is strictly forbidden to aim the gun at the human body or the electric box appliance;
10. In the normal spraying state, if the spray gun suddenly stops discharging, immediately close the material cutting valve to stop the inspection.

Contact Details
Zhengzhou Yaku Electromechanical Equipment Co.,LTD

Contact Person: Yu

Send your inquiry directly to us (0 / 3000)